one bricklayer can build a wall in 6 hours. another bricklayer could build the same wall in 4 hours. if they work together, how long will it take to build the wall?

Respuesta :

caylus
caylus caylus
  • 04-08-2016
Hello,

Let's
V1 the velocity of the 1st bricklayer,
V2 the velocity of the 2nd bricklayer,

1wall=V1*6==>V1=w/6
1wall=V2*4==>V2=w/4
==>V1+V2=w/6+w/4=10w*24=5w/12

Let's t the time for the 2 bricklayer to build the wall
(V1+V2)t=w
==>5w/12*t=w
==>t=12/5 (h)=2h24min.



Answer Link

Otras preguntas

what were the main affirmations of the declaration of the rights of man and the citizen
For each store,what is the ratio of the number of cans to the price:24 packs (2 for 9);12 packs (4 for 10);12 packs (3 for 9)
A family uses 12,986.64 Swiss francs per year to pay a mortgage that requires US dollars. Approximately how much, in US dollars, does the family spend per month
what is 12/75 simplest form
Match the civilization with its famous architecture. 1. Egypt water tank and citadels 2. Mesopotamia ziggurats 3. Indus Valley pyramids
what are positive and negative effects about industrialization?
What is two added to double a number in algebraic expression
981,657 rounded to nearest ten thousand
What was one major effect of industrialization on American society?
What is the Noble gas notation of silicon (Si)? [Ne] 2s22p2 [Ar] 3s23p2 [Ne] 3s23p2 [Mg] 3p2?