katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

A parallelogram whose sides are all the same length
An architect is designing square windows with an area
Which disorder is characterized by the clearing of the digestive tract that follows cycles of overeating?a. Obesityb. Bulimiac. Anorexia Nervosa d. Binge Eating
According to Chargoff rule, if a sample of DNA is 32% Adenine, what is the percentage of Guanine?​
a year on earth is 365.26 days long a year on satum lasts over 29 times longer than earth which on the following best explains this difference between the two p
plz don't report. related to studies (bio). don't scamwhat is the colour of breast milk?girls ​
fertilization of an egg to form a zygote takes place in?A.urethraB.uterusC.cervixD.fallopain tube​
At Ruth Company, events and transactions during 2020 included the following. The tax rate for all items is 20%. (1) Depreciation for 2018 was found to be unders
Speech on the factors causing internal and external conflicts and how to overcome them
Please help it’s due right now