goeln1260 goeln1260
  • 01-07-2020
  • Physics
contestada

give relation between potential work and time​

Respuesta :

mfonudo
mfonudo mfonudo
  • 04-07-2020

Relation between work done and potential is a change in the potential energy associated with the force. The negative sign provides the convention that work done against a force field increases potential energy, while work done by the force field decreases potential energy.

Answer Link

Otras preguntas

Find many ways of arranging 24 counters in equal rows as you can. Write a multiplication sentence for each way
Help me with this question please! WORTH 20 POINTS!!! Which of these is NOT considered to be a region that contains LEDCs (Less Economically Developed Countries
The graph shows the number of pages read on average by 4 middle school students. Who read the least number of pages on average? ​
Convert 4x-2y=6 into slope intercept form
In the diagram, the measure of angle 6 is 989 1/2 43 516 817 What is the measure of angle 7?
Eric surveyed 40 students at his school and found that 0.65 of the students he surveyed said their favorite class is math. Another 35% of the students he survey
Wind, hydropower, and solar can all be used to make ___​
please help i’m struggling
La abuela de Jorge, cuando llegan las fechas navideñas, reparte 120 € entre los tres nietos de la siguiente forma: Jorge, como es el mayor, recibe 10 € más que
Which expression can be used to calculate 15 1/2% of 3500?​