raazshah661 raazshah661
  • 03-09-2020
  • Mathematics
contestada

A can do a piece of work in 20 days and B can do it in 12 days,B work for 9 days,in how many days A alone can do the work​

Respuesta :

roseheart889 roseheart889
  • 03-09-2020

Answer: 9

Step-by-step explanation:

Answer Link

Otras preguntas

The dimensions of a brick that weighs 25 N are 0.19 m × 0.07 m × 0.095 m. What pressure does the brick exert on the ground if it is resting on its largest face?
The process by which rocks are broken down into smaller fragments by the atmosphere and other factors in the environment is called?
The Indus, Ganges, and Brahmaputra were important to ancient India because they were
Which word is an interjection commonly used in advertising?
The graph of y = 4x - 11 is translated up 8 units. Which equation represents the translated graph? f y = 4x - 19 g y = 4x - 3 h y = 12x - 11 j y = 12x - 3
The neolithic revolution is most closely associated with....
The entire region of Northern Africa and southwest Asia has a climate generally described as?
What is the lateral area of the rectangular prism with a base length of 17 m, a base width of 7 m, and a height of 5 m?
The number of waves that pass a particular point in a unit of time is called the __________ of the waves. (a) rarefaction (b) compression (c) amplitude (d) freq
The neolithic revolution is most closely associated with....