medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

What is the past perfect tense of "I walked to the store yesterday"
An airfoil of chord length 2m and span 15 m has an angle of attack as 6 0 .the airfoil is moving with a velocity of 80m/s in air whose density is 1.25kg/m3 .
What’s the value of X when 10 X equals 12
In two separate drawers, there are 12 pairs of socks, 9 of which are white, and 7 t-shirts, 5 of which are white. If you randomly select one pair of socks from
Simplify the algebraic expression by combining like or similar terms 7x+5y-2x
Which algerbric expression represents this phrase the product of 40 and the distance to the finish line
convert the following measurment​
50 POINTS!! I need help ASAP The Second Gate As you move through the first gate, you can see another gate not far in front of you. You approach the second gate
What are rational numbers and irrational numbers? please use simple language.
The ethical principle of beneficence matches which of these ethical considerations