azharkareem2340 azharkareem2340
  • 01-03-2021
  • Mathematics
contestada

It takes 2 workers 6 days to paint a mansion. How many days would it take 4
workers to do the same job?

Respuesta :

dontmindme3
dontmindme3 dontmindme3
  • 01-03-2021

Answer:

2 workers = 6 days

4 workers = 3 days

Step-by-step explanation:

If it takes 2 workers 6 days, if you seep up the process with 4 workers, you would divide the days by 2 because you multilpied the workers by 2. So, it would take 3 days with 4 workers. I hope that makes sence.

Answer Link

Otras preguntas

Why was Lincoln deter men to keep the border states in the union?
Jessica is making two loaves of banana banana bread she needs 3/4 cup of sugar for each loaf of measuring cup can only hold 1/4 Cup of sugar how many times what
Which of these processes take place at the same temperature? freezing and condensation melting and sublimation condensation and vaporization sublimation and boi
If Luis goes on a diet and does not exercise, one of the negative effects of this regimen will be _____. weight gain the loss of muscle tissue increased resting
Which statement BEST captures the importance of good personal hygiene?
what should i capitalize in the phrase:The song "Singing in the rain" comes from the movie of the same name starring Gene Kelly, Debbie Reynolds, and Donald O'C
Convert 4.57 hectograms to milligrams
Is 3/12 and 4/10 equal
Prokaryotes fall under the _____ and _____ domains. Archaea; Bacteria Archaea; Eubacteria Bacteria; Protista Bacteria; Eukarya
What two nations have the largest populations on Earth? China and Japan China and India the United States and the Soviet Union China and Korea