Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

Which best states how ideas from classical philosophy were applied to Renaissance government? A Ideas from classical philosophy were used to improve the structu
The following is an incomplete paragraph proving that ∠WRS ≅ ∠VQT given the information in the figure where segment UV is parallel to segment WZ.: Segments UV a
Why does the enzyme pepsin (present in the stomach) denature in the intestine? The enzyme denatures due to change in temperature as it enters the intestine. The
In which system of government would states function independently of eachother
4 tens + 6 tens in standard form
the school is 2 kilometers away from the town library what is the distance in meters
the hydrologic, rock, and tectonic cycles are powered by two main energy sources. they are the _____. sun and moon
-7(-5v-3u 4) use the distributive property to remove the parentheses
the new total is $60,but the sales tax is 5% of the bill. How much is the sales tax?
Which one of the following statements correctly defines active site? A. The active site is a site on the enzyme molecule where specific substrate molecules bind