henriquefvboas68241 henriquefvboas68241
  • 01-08-2022
  • Business
contestada

In general, the production manager is responsible for the materials price variance. True or false?.

Respuesta :

PallasAthena23
PallasAthena23 PallasAthena23
  • 01-08-2022
False

In general, materials price variance is the responsibility of the purchasing manager, not the production manager.
Answer Link

Otras preguntas

algebraic expression for x subtracted from 15
how did Forrest Fenn make a living in Santa Fe​
You find what you believe is a new species of animal. Which of the following characteristics would enable you to argue that it is more closely related to a flat
As a result of these processes, the single celled organism accomplishes 1)Gamete production 2)energy production 3)sexual reproduction 4)asexual reproduction
Polygon q is a scaled copy of polygon p using a scale factor of 1/2 polygon q’s area is what fraction of polygon p’s area?
The Roman Catholic Church ——— And became less wealthy as a result of the Protestant movement
Which development in plants has contributed to the evolution of large trees?
Consider that the length of rectangle A is 10 cm and its width is 6 cm. Which rectangle is similar to rectangle A? A) A rectangle with a length of 9 cm and a wi
is -1 1/4+ 2- 3/4= -(1 1/4 + 3/4) +2
Find the mean of the set of numbers {-9,-8,4,-1}