the total cost for a job is 1,766. the cost for material is 847.00 . 3 employees are paid 8 dollars an hour for 22 hours of work. what is your profit

Respuesta :

Aliwohaish12
Aliwohaish12 Aliwohaish12
  • 02-07-2017
Total cost= 1766

Material cost=847

3 employees are paid 8 dollars an hour for 22 hours so
Labor cost=8×22=176

Profit=total cost-(material cost+labor cost)
Profit=1,766−(847+176)=743
Answer Link

Otras preguntas

Three numbers are in the ratio 6:3:1, and the sum of these numbers is 420. If the first number is reduced by 50%, and the second number is increased by 42, and
what is 1/2 plus 9/10
what did anna sofia nysten do after the titanic sinking
what types of units are used to describe area?
when did fair trade start
Indicate true or false as to whether the following equation is quadratic 2x-4x+1=0
how many year and months did it take to build blackpool tower england
A circle has an area of 16 pie square meters.  What is the circumference of the circle?  Please show how to solve.  Thank you
How much energy is contained in the mass of a 60-kilogram person?
colby wants to set sqaure tiles on the top of a box the top of the box is a rectangle 71/2 inches long and 51/2 inches wide how many 1/2 inch tiles would he nee