Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

What did Alexander Hamilton mean when he said the public debt "was the price of liberty."?
A mixture of alcohol and water contains a total of 50 ounces of liquid. There are 10 ounces of pure alcohol in the mixture .what percentage of the mixture is w
When did The Hunger Games become a NY Times bestseller? March 23, 2012 December 2008 August 24, 2010 November 2008
What did the police do to try to stop people from panicking after hearing the radio version of The War of the Worlds?
Which of the following applications does not belong to "ser?" -time -location -occupation -nationality
Which of the following is an annual expense? a. clothing b.life insurance c.entertainment d.transportation
Pleeeeeeeeeease HELP ME! THIS IS VERY LATE WORK! A bag of candy weighs 25.62 ounces. A group of 4 friends is going to share the bag of candy equally. Part A: M
Alyssa emptied out her change jar to buy a new binder for school. she found 147 coins consisting of dimes and nickels that totaled 11.65. write a system of equa
A number cube with six sides numbered 1 through 6 is rolled. the probability of rolling a 5 is 16 .what is the probability of not rolling a 5?enter your answer
Is the correct answer B?